Fantastic Futures 2019- Y4 Bridge Challenge

Y4 were set an engineering challenge inspired by CECA. We had to design and build a bridge which spanned 30 cm. Not only did we need to think about the length, we needed to ensure it was as strong, as it needed to hold a cup of as many 1p coins as possible. Not only did the challenge test our design and engineering skills, it also tested our team work and communication skills too! We had great fun!